This water project has not been successful so far. The water treatment system is working at Kichahi, but there are technical problems at the main well at the crossroads. The submersible pump is stuck in the well, and the entire pipe will have to be dug out and the pump removed. All we have now is a pipe sticking out of the ground next to the water tower, and a pond around the pipe. But there are lots of happy frogs……
“He raises the poor from the dust and lifts the needy from the ash heap; he seats them with princes and has them inherit a throne of honor” 1 Sam 2:8
Tuesday, December 8, 2009
UPDATE: Kichahi Water Project
October 2009
This water project has not been successful so far. The water treatment system is working at Kichahi, but there are technical problems at the main well at the crossroads. The submersible pump is stuck in the well, and the entire pipe will have to be dug out and the pump removed. All we have now is a pipe sticking out of the ground next to the water tower, and a pond around the pipe. But there are lots of happy frogs……
This water project has not been successful so far. The water treatment system is working at Kichahi, but there are technical problems at the main well at the crossroads. The submersible pump is stuck in the well, and the entire pipe will have to be dug out and the pump removed. All we have now is a pipe sticking out of the ground next to the water tower, and a pond around the pipe. But there are lots of happy frogs……